Skip to content

ORA

  • Sustainability
  • Projects
  • Publications
    • Reflect Reconciliation Action Plan
    • Guides
    • ORA News
    • Articles
  • About
  • Get in touch
  • Sustainability
  • Projects
  • Publications
    • Reflect Reconciliation Action Plan
    • Guides
    • ORA News
    • Articles
  • About
  • Get in touch

Narrogin Railway Masterplan

Narrogin Heritage Railway Master Plan- For the Shire of Narrogin – in progress

State Heritage Listed Place – Master Planing, Conservation, Adaptative Reuse and Upgrade

In late 2020, The Shire of Narrogin sought to integrate and facilitate delivery of a suite of visions and adopted policies backed by previous consultant reports which had previously languished on the back-burner of delivery in the following areas of concern:

• Narrogin Townscape Study Review 2016
• Gnarojin Park Master Plan 2019
• Shire of Narrogin Walk Trails Master Plan 2019
• Stories of Us – Narrogin Heritage Walk Trail brochure
• Narrogin Railway Station & Goods Shed Conservation Management Plan 2020
• Narrogin Railway Station & Goods Shed Adaptive Reuse Strategy 2020
• Shire of Narrogin Public Art Strategy & Masterplan 2019
• Shire of Narrogin Disability Access & Inclusion Plan 2018-2023
• Narrogin Tourism Strategy 2019
• Report of an Aboriginal Ethnographic Survey for the Gnarojin Park Master Plan 2020 (Executive Summary)
• Boorloo Kwedjang Baradip Yanginy – Perth Old Story Telling brochure
• Westrail Lease Number: L6578 Narrogin WAGRC & Town of Narrogin dated Dec 1996

ORA conducted an exhaustive desktop review of the literature and developed a detailed brief before synthesising a Precinct Master Plan which not only reconciled the competing and complementary objectives, but also can serve as a template for delivery of the series of related projects in and surrounding the Heritage Railway Precinct. ORA’s capacity to utilise human-centred design-thinking to translate disparate aspects of a complex brief has resulted in an actionable plan for the Precinct, nowwell into delivery stage with the refurbished Railway Station, murals and heritage artifacts, wayfinding and signage, and landscaping treatments completed or underway.

We'd love to let you know what we're up to. Subscribe here.

Get in touch

  0412 869 863

admin@regionalarchitect.com.au

PO Box 190, Mt Hawthorn WA 6915
576 Brookton–Corrigin Road, Brookton WA 6306
ABWA Reg #3315

© 2026 ORA. All rights reserved.
Back to top