Joseph Filia (1949–2026) spent three decades at Main Roads Western Australia making the state’s roads part of its landscape rather than a scar across it, and the corridors he worked on — the Graham Farmer Freeway, Gateway WA, NorthLink — show what that means in practice.
Who he was
Filia was born in Queensland in 1949 and went to Brisbane State High School. He started a science degree at the University of Queensland, left after a year, and worked with CSIRO before moving to Perth in the early 1980s.
He graduated from the University of Canberra with a Bachelor of Landscape Architecture in 1988 and added a postgraduate diploma in information systems in 1991. Before Main Roads he worked with Tract and Landmark Consultancy, and at the City of Perth.
Main Roads, from 1995
He joined Main Roads Western Australia as a landscape architect in 1995 and became its most senior one, leading the Urban Design team in the Environment and Heritage Branch.
The role gave him unusual scope. In most road agencies, landscape work is amenity applied at the end of a project. His position was that roads should contribute to the quality of the public realm and reflect the character of the state, which puts vegetation, visual quality and urban design into the brief at the start.
The projects
The corridors documented as his work are the ones that shaped how Perth moves:
- Graham Farmer Freeway and Tunnel
- Gateway WA
- NorthLink
- Reid Highway
- Bunbury Outer Ring Road
- The Wildflower Capital Initiative
That last one is the clearest expression of the idea. It combined WA wildflowers, roadside landscape design, urban design, public art and infrastructure into a journey through Perth, and drew government, landscape, planning, horticulture and arts practitioners in together. The public record describes his role on these projects as stewardship rather than authorship.
Vegetation as an asset
Two shifts he helped bring into Main Roads outlasted the projects themselves.
He helped introduce the “green asset” concept, under which roadside vegetation is something the organisation holds and maintains rather than something to be worked around. He argued for keeping vegetation in road reserves and putting new planting there. And he was an early advocate for remote sensing and LiDAR to assess what is actually growing along a corridor, instead of relying on site inspections alone.
His work also contributed to the first Visual Landscape Planning Guide for Western Australia, the identification of Locations of Urban Design Significance in the metropolitan road network, feature lighting, public and community art, green and blue infrastructure, and corridor strategies.
The published record
One document is held in a public collection: Visual quality management, published by Main Roads in 1998 in two volumes. Stage 2, a summary and recommended process with guidelines, is credited to Sue Milthorpe and Joseph Filia. Stage 1 is a position paper by Tract (WA) Pty Ltd, written by Andree King. The catalogue does not say who led Stage 2.
Recognition, in the end
Filia died in 2026. On 24 September that year, the Australian Institute of Landscape Architects’ WA chapter announced him as the recipient of its President’s Award, made posthumously, for his contribution to landscape architecture and to the public realm in Western Australia.
What his approach asks of designers now
Three habits from his work transfer to any project where built works meet a living landscape.
Put the living system in the brief, not the planting schedule. Vegetation, water and visual character that arrive after the design is fixed can only be decoration. Arriving first, they shape alignment, levels and cut and fill while those are still open questions.
Fund establishment, not planting day. Trees fail in the years after they go in, and someone carries the water and maintenance bill. A planting schedule with no funded establishment period is an intention rather than a result.
Count what is already there before you clear it. Main Roads surveys roadside vegetation rather than assuming. On a house block the principle is the same: an arborist’s report and a survey cost far less than removing mature trees you could have kept.
Where to take it next
If your project moves people across land — a road, a path, a car park, a school or a depot — raise the landscape questions before the layout is locked: what already grows here, where water goes, and what the place will look like from inside a car and on foot. ORA works on residential, community, commercial, heritage and landscape projects across Perth and regional Western Australia.
Most of the biography above comes from Filia’s obituary in Landscape Australia and from AILA WA’s award announcement, so the early career details rest on those two sources; the 1998 publication and the 2026 award are separately recorded.